Applying for financial aid for renewable energy-based technical installations (PRIMe House 2017)

Last update

The Environment Agency (Administration de l'Environnement) grants subsidies for investments in projects aimed at rationalising the use of energy and promoting the use of renewable energy sources.

The agency grants financial aid—technical installation subsidies known as 'PRIMe House' subsidies—to subsidise the investment and installation costs of the following:

  • solar thermal systems;
  • solar photovoltaic systems;
  • heat pumps;
  • wood-fuelled boilers;
  • implementation of a heat network and/or connection to a heat network.

For each type of system, potential applicants should contact the communal administration for the area where the building is located to ascertain whether a building permit is required or not.

Applications must be filed with the Single point of contact for housing assistance (Guichet unique des aides au logement) after completion of the works.

Note: PRIMe House subsidies are granted once per installation and can only be obtained for residential buildings located in Luxembourg.

Technical installations for which financial aid was granted under the 2012 financial aid scheme are not eligible.

Who is concerned

Financial aid may be applied for by any person wishing to improve the energy performance of their home (detached house or house divided into flats). Eligible candidates include:

  • natural persons;
  • legal persons established under private law;
  • public legal persons other than the State.

Applications for financial aid may be filed by the legal representative of a group of natural or legal persons provided that the applicant is part of that group.

Applications may also be filed by the owner(s) of the residence, except when there is a change of ownership and the new owner of the residence and/or technical installation forgoes the aid in question for the benefit of the former owner who made the investments.

If a technical installation other than a solar photovoltaic system was implemented concurrently with either the construction of a new 'high energy performance' house, or with the energy efficiency renovation of an eligible existing residential house pursuant to the provisions of the amended Grand Ducal regulation of 12 April 2012, the installation in question falls under the 2012 financial aid scheme.

Prerequisites

PRIMe House aid can only be obtained for a residential building located in Luxembourg and provided that the aid is not intended for:

  • a used installation; or
  • the exchange, replacement or repair of a part of a system that cannot function independently of the rest of the system.

In addition, installations must satisfy certain criteria.

Hydraulic balancing

For the installation of a heat pump, a wood-fuelled boiler or a solar thermal system with auxiliary heating in a new construction, hydraulic balancing must be performed.

Solar thermal systems

  • solar thermal collectors must be certified by the European Solar Keymark quality mark;
  • the installation must be equipped with a calorimeter;
  • the gross surface area of the collectors with complementary heating must be:
    • greater than or equal to 9 m2 for flat-plane collectors;
    • greater than or equal to 7 m2 for vacuum tube collectors;
  • non-glass thermal collectors with polyethylene pipes and hybrid solar collectors generating hot water and electricity are not eligible for the financial aid.

Solar photovoltaic system

  • the peak power capacity of the installation must be lower than or equal to 30kW;
  • the installation must be mounted on the roof or the façade of the building, or incorporated in the envelope of the building, whether the building is used for residential purposes or not;
  • hybrid solar collectors generating hot water and electricity are eligible as photovoltaic collectors.

Heat pumps

  • the following types of heat pumps are eligible for the financial aid:
    • geothermal heat pumps with vertical sensors (geothermal probes) or horizontal sensors (geothermal collecting lines and baskets) compliant with the following coefficients of performance (COP): COP greater than or equal to 4.3 in the B0/W35 regime;
    • heat pumps combined with a latent heat accumulator and a solar thermal collector, compliant with the following coefficient of performance (COP): COP greater than or equal to 4.3 in the B0/W35 regime;
    • direct expansion geothermal heat pumps compliant with the following coefficient of performance (COP): COP greater than or equal to 4.3 in the E4/W35 regime;
    • air-water heat pumps (including vented air-water heat pumps) compliant with the following COP: COP greater than or equal to 3.1 at A2/W35 (only for near-zero energy single-family houses);
  • the heating system must be able to supply the heating circuit with a maximum starting temperature of 35°C (35W). If this is not the case, the performance coefficient of the heat pump must reach at least the required threshold at W35 with the chosen starting temperature;
  • the power supply of the heat pump must be equipped with an electrical meter.

Wood-fuelled boilers

  • the installation must have controlled combustion (power and combustion regulation);
  • wood-pellet boilers or wood-chip boilers must be equipped with an automatic feeder and ignition system;
  • wood pellet stoves must be integrated in a central heating system and the degree of useful heat transfer must reach at least 50 %;
  • for staged log combustion boilers and combination wood log-pellet boilers, a buffer tank with a minimum capacity of 55 l/kW must be put in place;
  • the following emission and yield thresholds must be complied with:
    • particle emission less than or equal to 20 mg/m3;
    • nitrogen oxide (NO) emission less than or equal to 200 mg/m3;
    • boiler production yield greater than or equal to 90 %;
    • combustion yield of pellet stove greater than or equal to 90 %;
  • a financial aid bonus of 30 % may be granted if:
    • the fossil fuel, electric or electric storage heating system was manufactured at least 10 years prior to the year of filing for the financial aid;
    • the replaced heating system was used as the main source of heating;
    • a report evaluating the energy performance of the heating system was drawn up using the 'Heizungscheck' tool (not necessary if an electric heating system is being replaced);
    • the recommendations for modernisation reported following the energy performance evaluation have been implemented.

Heating networks and connections

The rate of coverage by renewable energy sources must be greater than or equal to 75 % (substantiated by presenting a certificate issued by the heating network operator).

Invoices

Invoices for the technical installations must be issued between 1 January 2017 and 31 December 2023 inclusive at the latest.

Deadlines

Applications for the financial aid must be filed with the Single point of contact for housing assistance within 4 years as of 31 December of the calendar year in which the invoice was issued.

Applications for financial aid may be submitted for investments and services for which the invoice is issued between 1 January 2017 and 31 December 2023 inclusive.

Except in the case of photovoltaic systems, the deadline by which the invoices must be issued is extended to 31 December 2024 inclusive, if the investments are concurrent with:

If the installations are not concurrent with energy efficiency enhancement works or a new sustainable construction, the deadline for submitting the application is 31 December 2024 at the latest.

If the installations are concurrent with energy efficiency enhancement works or a new sustainable construction that is eligible under the 2017 aid scheme, the deadline for submitting the application is 31 December 2026 at the latest.

How to proceed

Filing an application

Subsidies for renewable energy-based technical installations may be granted for both renovation projects and new constructions, and may also be applied for independently of such projects.

Applicants must send the following documents to the Single point of contact for housing assistance (preferably by registered letter), or submit them in person:

  • for private individuals: the DEPA-2017 aid application form for natural persons; or
  • for legal persons: the DEPA-2017 financial aid application form for legal persons.

Along with the financial aid application form, applicants must also provide:

  • the detailed and receipted invoices in connection with the requested financial aid. Proof of payment of the invoices must be attached. The invoices may refer to an itemised estimate, in which case the latter must be attached to the invoice;
  • one or more specific technical data sheets, depending on the type of installation:
    • photovoltaic system;
    • heat network or connection to a heat network;
    • thermal solar installation;
    • heat pump;
    • wood-fuelled boiler;
  • if applicable, the energy consultant's report on the technical installation(s) in question.

Given that each application may cover different domains depending on the owner's or architect's choices, the various sheets should be accompanied by any additional documents specified on the application forms.

If the application is for a co-ownership or multi-unit residence, the applicant must attach:

  • appendix form COLL-2017;
  • a power of attorney from each owner;
  • the list of the flats, specifying the energy reference area per flat, excluding the common areas.

If the application concerns a technical installation in a new house, the applicant must also attach the hydraulic balancing protocol, if the installation concerns the following:

  • a heat pump;
  • a wood-fuelled boiler;
  • solar thermal systems with auxiliary heating.

The Single point of contact for housing assistance may ask the applicant to provide any documents it deems necessary to process the file.

If the aid is granted, the beneficiary's file may be reviewed at any time.

The technical installations may also be eligible for financial aid for an energy performance assessment and report by an approved energy consultant. If the improvement only applies to a renewable energy-based technical installation, the subsidy will be reduced by 70 %.

Table of subsidies for technical installations

Subsidies for solar thermal systems

Technical installation

Subsidies

Maximum amount

solar thermal system for production of domestic hot water

50 % of actual costs

  • EUR 2,500 for an individual house
  • EUR 2.500 per housing unit for a multi-unit building
    (EUR 15.000 maximum)

Solar thermal systems with auxiliary heating

50 % of actual costs

  • EUR 4,000 for an individual house
  • EUR 4.000 per housing unit for a multi-unit building
    (EUR 20.000 maximum)

An additional flat-rate subsidy of EUR 1,000 may be granted if the solar thermal system is installed concurrently with a wood-fuelled boiler or a heat pump.

Subsidies for solar photovoltaic systems

Technical installation

Subsidies

Maximum amount

Photovoltaic solar installation or hybrid collector

20 % of actual costs

  • EUR 500 per kWpeak

Subsidies for heat pumps

Technical installation

Subsidies

Maximum amount

Geothermal heat pump (geothermal probes, geothermal collectors
or latent heat accumulator systems with solar thermal collector)

50 % of actual costs

  • EUR 8,000 for an individual house
  • EUR 6,000 per housing unit for a multi-unit building (EUR 30,000 maximum)

Air-water heat pump or compact device (only for near-zero energy single-family houses)


25 % of actual costs

  • EUR 2,500 for an individual house

Compact device including controlled mechanical ventilation and recycled air/water heat pump (only for near-zero energy single-family houses)

 

25 % of actual costs

  • EUR 2,500 for an individual house

Subsidies for wood-fuelled boilers

Technical installation

Subsidies

Maximum amount

Wood pellet or wood chip boiler

40 % of actual costs

  • EUR 5,000 for an individual house
  • EUR 4,000 per housing unit for a multi-unit building (EUR 24,000 maximum)

Wood pellet stove (connected to the heating network)

30 % of actual costs

  • EUR 2,500 maximum for an individual house

Log boiler or combination log/pellet boiler

25 % of actual costs

  • EUR 2,500 maximum for a detached or a semi-detached house

Installation of a buffer tank with a capacity of 30 l/kW (wood pellet or wood chip boiler)

Bonus in the amount of 15 % of the allocated financial aid

 

Replacement of an existing fossil fuel boiler or electrical heating system by a wood-fuelled boiler

Bonus in the amount of 30 % of the allocated financial aid

 

Urban heating network

Technical installation

Subsidies

Maximum amount

Connection to an urban heating network

 
  • EUR 50 per kW (15 kW maximum) for an individual house (detached house)
  • EUR 15 per kW (8 kW maximum) for an flat in a multi-unit building

Installation of an urban heating network (at least two residential buildings must be connected)

30 % of actual costs

  • EUR 7,500

Additional aid

Some communes grant supplementary aids on top of state aids for energy savings and renewable energies. The amount of aid to be received from the commune is available on the 'myrenovation' application.

The promotional bonus nova naturstroum rewards projects that promote renewable energy sources. More information can be found on www.enovos.lu.

Natural gas and electricity suppliers active in Luxembourg also offer aid programmes for the implementation of energy efficiency measures. The list of suppliers is available on the website of the Luxembourg Regulatory Institute (ILR) website:

Payment of the aid

The aid is generally transferred directly to the applicant's account.

If the application for financial aid is submitted by the legal representative of a group of natural or legal persons, the aid is transferred directly to the bank account of the legal representative, who must immediately credit the bank accounts of the natural or legal persons concerned with their respective share of the aid.

A copy of these payments must be sent to the Single point of contact for housing assistance.

Repayment of aid

If the applicant has already received the aid, they may be required to return it, if:

  • the applicant is found to have made inaccurate or incomplete statements in order to obtain the aid; or
  • the applicant fails to provide the Single point of contact for housing assistance with the requested declaration, information or documents.

Online services and forms

Who to contact

Single point of contact for housing assistance

  • Ministry of Housing and Spatial Planning Single point of contact for housing assistance

    Address:
    11, rue de Hollerich L-1741 Luxembourg Luxembourg
    Phone:
    (+352) 80 02 10 10
    Monday to Friday from 8.00 to 16.00
    Email address:
    info@ml.etat.lu
    Closed ⋅ Opens Monday at 8.00
    Saturday:
    Closed
    Sunday:
    Closed
    Monday:
    8.00 to 12.00 , 13.30 to 16.00
    Tuesday:
    8.00 to 12.00 , 13.30 to 16.00
    Wednesday:
    8.00 to 12.00 , 13.30 to 16.00
    Thursday:
    Closed
    Friday:
    8.00 to 12.00 , 13.30 to 16.00
    Thursdays by appointment only
  • Ministry of Housing and Spatial Planning Single point of contact for housing assistance

    Address:
    11, rue de Hollerich L-1741 Luxembourg Luxembourg
    Phone:
    (+352) 80 02 10 10
    Monday to Friday from 8.00 to 16.00
    Email address:
    info@ml.etat.lu
    Closed ⋅ Opens Monday at 8.00
    Saturday:
    Closed
    Sunday:
    Closed
    Monday:
    8.00 to 12.00 , 13.30 to 16.00
    Tuesday:
    8.00 to 12.00 , 13.30 to 16.00
    Wednesday:
    8.00 to 12.00 , 13.30 to 16.00
    Thursday:
    Closed
    Friday:
    8.00 to 12.00 , 13.30 to 16.00
    Thursdays by appointment only

Klima-Agence

Related procedures and links

Procedures

Links

Further information

Legal references

Your opinion matters to us

Tell us what you think of this page. You can leave us your feedback on how to improve this page. You will not receive a reply to your feedback. Please use the contact form for any specific questions you might have.

Fields marked with an asterisk (*) are mandatory.

Did you find what you were looking for?*
How would you rate this page?*
Very poor
Very good

Leave a comment to help us improve this page. Do not provide any personal information such as your email address, name, telephone number, etc.

0/1000

Please rate this page

Your opinion has been submitted successfully!

Thank you for your contribution. If you need help or have any questions, please use the contact form.

Would you like to help us make digital public services more user-friendly by submitting your suggestions for improvement?

Then visit Zesumme Vereinfachen, the online participation platform dedicated to administrative simplification in Luxembourg.

Let's simplify things together

An error occurred

Oops, an error has occurred.